Tubul Bridge Replacement Piles

Materials: Carbon Steel Piles ASTM A252 Gr. 2. Variable Lengths  (1500 to 1200mm) and Diameters (1000mm to 1300mm).

Project Cost: US$ 1.320.325,01

Client
Besalco Ingeniería y Construcción for the Ministerio de Obras Publicas (MOP)
Location
Chile - December 2012